Form Center

By signing in or creating an account, some fields will auto-populate with your information and your submitted forms will be saved and accessible to you.

Town of Shady Shores Building Permit Swimming Pools

  1. logo
  2. TOWN OF SHADY SHORES

    Development Department

    101 S. Shady Shores Rd. 

    Shady Shores, TX 76208

    940-498-0044 x 110

    Hours: 9:00am- 2:00pm; Monday- Friday 

    Permit Tech: Joan Davis

    development.permits@shady-shores.com


  3. Swimming Pool Permit Application

  4. Please list block and Lot Number
  5. Plastic, Fiberglass, Cement, etc.

  6. 2 Sets of Plans must also be delivered to Town Hall
  7. Instructions

    All plans shall be drawn to scale or not less than one-eighth of an inch to the foot, on paper, in ink. All distance and dimensions shall be accurately figured and drawings made explicit and complete, showing lot line and including information pertaining to the pool, walk, fence (five (5) feet) construction, water supply drainage, circulation, and water disposal system. Show all appurtenances pertaining to the swimming pool. Detail plans and vertical elevations shall be provided in accordance with the building code. 

  8. As of September 1st, 2022 the $50.00 plan review fee will be due in order to start the permit process. Applicants will receive an email from the Permit Department with instructions once the application has been accepted. The plan review fee will be included as part of the final fees and is non-refundable. If the  $50.00 plan review fee is not paid within 30 days, the application will be voided and the fee will be collected again in order to re-start the application process. 

  9. Acknowledgement

    The Undersigned applicant certifies that the project described herein will be built according to plans and specifications submitted at them of application. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. Granting of a permit does not presume to give authority to violate or cancel the provision of any local or state law regulating construction or the performance of construction. When a permit has not been issued within 180 days following the date of application, the application and plan review will expire. The town Does not assume responsibility for the workability of sanitary sewer on all lots. A Certificate of Occupancy must be issued before any building is occupied. The permit application must be presented with the applicant’s original signature. All submittals sent by mail or delivered by courier should be submitted to the attention of the Town of Shady Shores Development Department

  10. By entering the submitter's name, you are signing the acknowledgment. 

  11. Leave This Blank:

  12. This field is not part of the form submission.